JCS undertook a commercial boiler replacement project at the prestigious Baglioni Hotel in London, replacing ageing heating equipment with a modern Hamworthy Wessex ModuMax system.
The existing installation consisted of six Hamworthy Wessex County boiler modules dating from the 1990s, providing a combined output of 1,200kW.
With restricted plant room space and the hotel remaining fully operational, the project required careful planning to ensure that heating and hot water services could be maintained throughout the replacement works.
Working within the constraints of the existing plant room, the replacement equipment needed to deliver the required heating capacity while occupying a smaller footprint.
Three Hamworthy Wessex ModuMax Mk3 196/392V modular boilers were selected, comprising six boiler modules arranged in three vertical stacks and providing a combined output of 1,176kW.
One of the biggest challenges was the lack of space for temporary boiler equipment during the changeover.
Rather than shutting down the existing heating system, JCS planned a phased installation, allowing the new equipment to be introduced while maintaining essential services to the hotel.
This approach required careful coordination of the replacement works within a confined plant room and an operational hospitality environment.
The project delivered a modernised commercial heating installation with a total output of approximately 1,176kW.
Through careful planning and phased replacement, JCS maintained heating and hot water services throughout the works, minimising disruption to the hotel and its guests.
The project demonstrates JCS’s ability to deliver complex commercial boiler replacements where restricted access, operational continuity and technical expertise are all critical considerations.