Take a look at a sample of them below
The hotel’s old boiler plant consisted of six Hamworthy Wessex County modules from the 90s with a total output of 1,200kW. Familiar with the brand, the owner got in touch with Hamworthy for a complimentary site survey to identify a suitable replacement.
Space restrictions in the hotel plant room, especially in terms of access, required compact new equipment. Three Wessex ModuMax mk3 196/392V modular boilers, consisting of six boiler modules in three vertical stacks with a total output of 1,176kW, were chosen. At the core of the boiler sits a stainless steel heat exchanger backed by a 10-year warranty. It delivers a high output from a small floor footprint and fits through a standard doorway.
However, space was in fact so limited, there was no room for a temporary boiler plant to provide heating and hot water during the changeover phase between old and new equipment. We opted to carry our a phased changeover of the system to ensure minimal disruption to the Hotel and guests.
Boiler repairs at Broadmoor Hospital
Service and repair Works to Hamworthy MELBURY MHE Boilers coupled with Riello RLS Dual Fuel Burners
Following a major flood at Croydon College, The existing 6 No. Hartley & Sugden Metrose E19 boilers were completely submerged. Working closely with the college, their consultant and the insurance company and with the support of our suppliers & partners, JCS refurbished the now obsolete boilers fitting new EOGB Baltur TBG150MC burners, carrying out alterations to the new gas supply, rewiring and remanufacturing obsolete items and resealing re-gasketing to return the boilers to as new condition.
Long standing relationships with our industry partners enabled us to secure replacement parts & equipment quickly despite the European, August manufacturing plant closures
Another successful well planned job by our team of professional workmen and office staff.
Full refurbishment of 4 No Hamworthy Shaftesbury HE400-14 Section boilers at Marsh Properties, Norwich.
Boilers Completely disassembled and rebuilt/resealed to provide many more years of reliable operation.
The trusted commercial contractor that gets the job done